City of Pharr

Water Transmission Main Improvements Project

TRIMAD prepared permits, design, and construction phase services. The project aimed to adhere to TCEQ requirements for dedicated water transmission mains to each elevated storage tank. Funding was supplied by TWDB under the DWSRF. The project involved installing a 1-mile, 16-inch water main.

Read More

Kleberg County

Sidewalk Ricardo & Riviera

Kleberg County was awarded two (2) Texas Department of Transportation (TxDOT) – Transportation Alternative Program (TAP) Grants for the incorporated communities of Ricardo and Riviera.

Read More

City of Donna

Lift Stations Design Project (TX GLO 2018 South Texas Floods CDBG-DR-4377)

The City of Donna Lift Stations Design Project, funded under the Texas Community Development Block Grant Disaster Recovery (CDBG-DR) Program administered by the Texas General Land Office (GLO), aims to enhance infrastructure resilience following the 2018 South Texas floods. TRIMAD has been contracted to provide specialized engineering services for the design and implementation of multiple lift stations critical to improving wastewater management and flood resilience in Donna.

Read More

City of San Juan

Alta Vista Waterline and Sanitary Sewer Line Improvements

The Alta Vista Waterline and Sanitary Sewer improvements project consisted of improving the waterline system and sanitary sewer along W Texas Avenue and Standard Avenue in the City of San Juan as well as milling and overlay of W Texas Avenue and Standard Avenue.

Read More

City of San Perlita

San Perlita Fire Station Rehabilitation and Expansion

Under the Texas Community Development Block Grant (TXCDBG) Program administered by the Texas Department of Agriculture (TDA), TRIMAD undertook the rehabilitation and expansion of the San Perlita Fire Station. This project aims to enhance building capacity and services to better serve the community’s fire protection needs.

Read More

City of Alamo

Morningside South-Sewer Project

The Morningside South – Sewer Project addresses critical wastewater infrastructure needs in the City of Alamo. TRIMAD was contracted by the city to evaluate and implement necessary improvements to the existing sanitary sewer collection system, including the construction of a new lift station on Ridge Rd.

Read More

City of San Juan

Lift Station Number 6 Relocation Project

This project defines Trimad Consultants, L.L.C. (TRIMAD) professional engineering services for improvements to the existing Lift Station #6 along Cesar Chavez Road in the City of San Juan, Texas. This project includes the addition of approximately 1,100 LF of deep Sanitary Sewer Line to abandon existing Lift Station #6 and relocate it South of the existing location. A 40-ft by 50-ft piece of land was acquired from the development of Oak Ridge Estates Subdivision.

Read More

City of San Juan

Subdivision Standards Manual

The Subdivision Standard Manual project was prepared to assist engineers, planners and architects during the development of infrastructure improvements in public right of way by specifying design standards. The manual will serve as a comprehensive guide to the planning, designing, and development of subdivisions within San Juan. Sections worked in the manual include: development requirements, submittal and plan requirements, off-street parking and loading requirements,

Read More

City of Pharr

Lift Station #23 Relocation/Improvements Project

The Lift Station #23 Relocation/Improvements Project in the City of Pharr, Texas, aims to enhance wastewater infrastructure by relocating and improving the existing lift station #23 along N. Sugar Road. This project is crucial for increasing operational efficiency and accommodating growth in the surrounding area.

Read More