McAllen, Texas

Celedon Therapy Clinic

Trimad Consultants, LLC provided full civil engineering and surveying services for the 1.26-acre Celedon Therapy Subdivision within the Igoa Business Campus. Our scope included topographic and boundary surveying, stormwater management design, civil site layout, utility and drainage plans, traffic and striping design, and coordination with the City of McAllen for Type Plan Review. We also provided construction-phase site observations to ensure the project was built in accordance with approved plans.

This project delivered a fully engineered, build-ready site to support the development of a modern therapy facility.

Scope of Work

  • Feasibility Study

    • Research and evaluation of existing water, sewer, and drainage utilities

    • Identify City, County, and utility purveyor requirements

    • Development of a preliminary subdivision layout

    • Meetings with governmental agencies such as

      • City of Mission Planning Department

      • Hidalgo County Drainage District No. 1

    • Preparation of an Opinion of Probable Construction Cost and summary report

 

  • Subdivision Design

    • Final subdivision plat preparation

    • Lot layout and right-of-way design

    • Design of roadways, cul-de-sac, and access points

    • Water, sanitary sewer, and drainage system design

    • Detention pond sizing and placement

 

  • Development Coordination

    • Support for permitting, recordation, and agency approvals

    • Coordination with applicable utility providers

    • Preparation of plans necessary for construction

 

Impact

This subdivision project provides new residential opportunities within a rapidly growing area of Mission, Texas. Through TRIMAD’s feasibility study and engineering design, the client gained a clear understanding of development requirements, infrastructure needs, and overall project costs—allowing them to move forward confidently with construction. The completed subdivision layout optimizes land use, integrates essential utility and drainage improvements, and supports long-term community growth. By delivering a complete, build-ready design package, TRIMAD helped streamline the development process and contributed to expanding local housing availability and neighborhood infrastructure.

Project Team

Project Manager: Ricardo Salazar, P.E. Lead Engineer & Designer: Alfonso Guzman, Graduate Engineer