Mission, Texas

Springwood Manor Estates

Springwood Manor Estates is a residential subdivision development located in Mission, Texas. TRIMAD Consultants, LLC provided construction management and site development services to transform the property from an undeveloped tract containing an existing residence into a fully serviced subdivision ready for future home construction. The project included demolition of the existing home, clearing and grubbing of the site, installation of water, sanitary sewer, and storm drainage infrastructure, construction of detention facilities, and coordination of roadway paving through specialized subcontractors. Through careful planning, utility installation, and construction oversight, TRIMAD delivered the critical infrastructure necessary to support the subdivision’s long-term growth while meeting all applicable City of Mission requirements.

Construction Services

TRIMAD Consultants, LLC provided construction management and site development services for Springwood Manor Estates, a residential subdivision located in Mission, Texas. The project transformed a vacant tract containing an existing residential structure into a fully prepared subdivision ready for future home construction.

Our construction scope included:

  • Clearing & Grubbing of the site to remove vegetation, debris, and existing obstructions.
  • Demolition and removal of the existing residence and associated site improvements.
  • Site Preparation & Earthwork to establish building pads, roadway grades, and drainage features.
  • Water Utility Installation, including connections to the City’s existing water system.
  • Sanitary Sewer Installation, including service connections and collection infrastructure.
  • Storm Drainage Infrastructure to manage runoff and support long-term drainage performance.
  • Detention Facilities Construction to meet local drainage and stormwater requirements.
  • Construction Coordination & Oversight of all subcontractors and utility installation activities.
  • Pavement Construction Management, including subcontracting and coordination of roadway paving operations.

Impact

The successful completion of Springwood Manor Estates converted an underutilized property into a fully serviced residential subdivision. The project provided:

  • New residential lots supported by modern utility infrastructure.
  • Improved drainage through the installation of stormwater and detention facilities.
  • Safe and reliable roadway access for future residents.
  • Increased housing opportunities within the City of Mission.
  • Enhanced property value through the redevelopment of a previously vacant tract.

Project Team

Developer: Villa Homes
Construction Services: TRIMAD Consultants, LLC
Project Manager: Ricardo Salazar, P.E.
Operator: Pablo Gonzales
Laborers: Mark Garcia, Ricardo Salazar, JR.