City of Pharr
Water Transmission Main Improvements Project
TRIMAD prepared permits, design, and construction phase services. The project aimed to adhere to TCEQ requirements for dedicated water transmission mains to each elevated storage tank. Funding was supplied by TWDB under the DWSRF. The project involved installing a 1-mile, 16-inch water main. TRIMAD successfully secured $14 million in funding from TWDB, resulting in the contractual agreement for the construction of a 1-million-gallon (mg) composite elevated storage tank.
Project Team:
Project Manager: Ricardo Salazar, P.E. Lead Engineer: Jose Perez, Graduate Engineer Lead Designer: Cruz Flores